Piling procedures: ASSISTANCE FOR DRIVING

Prior drilling facilitates driving in harder land

The prior drilling of land is very effective when the use of vibration is too difficult, especially in cohesive soils.

Piling assistance

  • The opportunely-located holes are drilled prior to the driving using drill bits coupled to the self-transporting sheet piling equipment (mäklers) or to excavators.
  • This technique enables piling in harder soils (especially when they are cohesive) in which vibration is not enough to install the sheet pile.
  • Ischebeck Ibérica, S.L. has extensive experience in the use of this technique.

Piling assistance